Friday, August 14, 2009

I have been on vacation so updates were kind of hard to make. In returning though I have had the chance to see a great deal done. Most of the facade is up and finished minus the front entrance and the main lounge windows. I have been trying to find out when we can see more of the grotesques that will be going up and hope to be able to get those images to you. Very soon we will be starting on the interior work as soon as the rest of the heating and electical work is done. It is nice to be able to walk up and down real stairs now and not the scafolding that was set up in the elevator shaft. I have pictures of the elevator shaft now which i think ar really cool.
elevator shaft

0 comments:

Post a Comment

 










Elmira College Since 1855